Injection Moulding Glossary: 130 Terms Every Buyer and Engineer Should Know
Injection moulding has its own vocabulary across tooling, materials, processing and quality. This glossary defines 130+ terms in plain language, grouped alphabetically. It is written for buyers and engineers who specify, quote or troubleshoot moulded parts — the same vocabulary Nordmould uses in its DFM reviews and quotes.
A
| Term |
Definition |
| A-side (cavity side) |
The mould half forming the part's outer, usually cosmetic, surface. |
| Additive |
Substance compounded into resin — colourant, UV stabiliser, flame retardant, lubricant — to modify properties. |
| Amorphous polymer |
Resin with disordered molecular structure (ABS, PC, PMMA, PS); low shrinkage, transparent grades possible. |
| Annealing |
Controlled post-mould heating to relieve internal stress and stabilise dimensions. |
| Anisotropic shrinkage |
Direction-dependent shrinkage, typical of glass-filled grades: less along flow, more across it. |
B
| Term |
Definition |
| B-side (core side) |
The mould half forming the part's inner features; usually houses the ejection system. |
| Back pressure |
Resistance applied to the screw during recovery, improving melt mixing and colour dispersion. |
| Barrel |
The heated cylinder in which the screw melts and conveys resin toward the mould. |
| Black specks |
Defect: degraded resin particles appearing as dark spots, usually from barrel or hot-runner dead spots. |
| Blister |
Defect: raised surface bubble from trapped gas or volatiles in the melt. |
| Boss |
Cylindrical feature receiving screws or inserts; sized ~2× fastener diameter, wall 40-60% of nominal. |
| Bridge tooling |
Interim aluminium tooling for low-to-mid volumes between prototype and production steel. |
| Bump-off |
Ejecting a shallow undercut by letting the part flex over the core; works only with flexible resins. |
| Burn marks (dieseling) |
Defect: scorched resin from air compressed at end of fill; a venting problem. |
C
| Term |
Definition |
| Cavitation |
The number of part impressions in a mould; multiplies output per cycle. |
| Clamp force |
Force holding the mould closed against injection pressure, rated in tonnes; ~0.3-0.8 t per cm² of projected area. |
| Cold runner |
Unheated channel system whose melt solidifies and is ejected with the parts each cycle. |
| Collapsible core |
Segmented core that collapses inward to release internal undercuts such as threads. |
| Colour streaks (marbling) |
Defect: swirled colour from poor masterbatch dispersion. |
| Cooling time |
Cycle phase in which the part solidifies; scales roughly with wall thickness squared. |
| Core |
The mould steel forming internal part geometry; also, to core out = to hollow a thick section. |
| Crazing |
Fine surface cracks from stress, chemicals or degradation. |
| Creep |
Slow permanent deformation of plastic under sustained load. |
| Cushion |
Small melt reserve ahead of the screw after filling, enabling effective packing. |
| Cycle time |
Total time per moulding cycle: close, inject, pack, cool, open, eject. |
D
| Term |
Definition |
| Delamination |
Defect: surface layers flaking off, usually from contamination or incompatible materials. |
| DFM |
Design for Manufacturability — pre-tooling geometry review; Nordmould provides it free with quotes. |
| Dieseling |
See burn marks. |
| Draft angle |
Taper on faces parallel to mould opening so the part releases; baseline 1° per side. |
| Drag marks |
Defect: scratches in the ejection direction caused by insufficient draft or rough steel. |
| Drying |
Removing moisture from hygroscopic resin (PA, PC, PBT, PET, POM, TPU) before processing. |
| Dwell |
See hold time. |
E
| Term |
Definition |
| Edge gate |
Common cold-runner gate cut into the parting line feeding the part edge; leaves a trimmed mark. |
| Ejection |
Removal of the part from the mould, normally by ejector pins, sleeves or a stripper plate. |
| Ejector pin marks |
Witness dents or whitening where pins pushed the part; minimised by cooling, draft and pin layout. |
| EDM |
Electrical discharge machining — sinker, wire and small-hole — used to shape tooling features; available in Nordmould's network. |
| Engineering resin |
Higher-performance polymer (PA, POM, PBT, PC, PPS, PEEK) specified for mechanical or thermal duty. |
F
| Term |
Definition |
| Family mould |
One tool producing different parts of an assembly per shot; volumes of the parts stay locked together. |
| FAI |
First Article Inspection — full dimensional report verifying the first production-representative parts. |
| Fan gate |
Wide cold-runner gate spreading flow evenly across wide flat parts. |
| Fill time |
Phase in which the cavity fills with melt, typically 0.5-3 seconds for small parts. |
| Flash |
Defect: thin excess material escaping at parting lines, pins or shut-offs. |
| Flow length ratio |
Ratio of melt travel distance to wall thickness; predicts whether a thin section will fill. |
| Flow lines |
Defect: visible rings or streaks recording the melt front's movement. |
G
| Term |
Definition |
| Gate |
The opening through which melt enters the cavity; type and location control fill and the witness mark. |
| Gate blush |
Hazy or frosted surface near the gate from high shear or turbulence. |
| Gate freeze |
The moment the gate solidifies, ending packing; sets final part weight and dimensions. |
| Glass-filled (GF) |
Resin reinforced with glass fibre (e.g. PA66-GF30); stronger, stiffer, more abrasive, anisotropic shrinkage. |
| Gloss variation |
Defect: patchy surface shine from uneven mould temperature, packing or polish. |
H
| Term |
Definition |
| Hardened steel |
Tool steel through-hardened to ~48-52 HRC (H13, S136) for long runs and abrasive resins. |
| Hold (packing) pressure |
Pressure maintained after filling to compensate shrinkage before gate freeze. |
| Hot runner |
Heated manifold-and-nozzle system keeping melt liquid inside the mould; no runner scrap. |
| Hot tip gate |
Hot-runner gate leaving a small ~0.5-1.5 mm dot on the part. |
| Hygroscopic |
Describes resins that absorb atmospheric moisture and must be dried before processing. |
I
| Term |
Definition |
| Insert moulding |
Moulding plastic around a pre-placed component, typically a metal threaded insert. |
| ISO 20457 |
International standard defining tolerance classes for moulded plastic parts (formerly DIN 16742). |
J
| Term |
Definition |
| Jetting |
Defect: worm-like flow pattern when a small gate fires into open space instead of landing on a wall. |
K
| Term |
Definition |
| Knit line |
See weld line. |
L
| Term |
Definition |
| Lifter |
Angled ejector that forms and releases an internal undercut during ejection. |
| Living hinge |
Thin integral flexure (0.2-0.35 mm) joining two rigid sections; PP and PE are the classic materials. |
| LSR |
Liquid silicone rubber — two-component platinum-cured elastomer moulded on dedicated equipment. |
M
| Term |
Definition |
| Masterbatch |
Concentrated pigment or additive carrier dosed into natural resin for colouring. |
| Melt temperature |
Actual temperature of the molten resin at injection; distinct from barrel setpoints. |
| MFI / MFR |
Melt flow index/rate — grams extruded in 10 minutes under standard load; a flow-ability ranking. |
| Mould (mold) |
The precision tool — cavity and core — that shapes the part; European spelling: mould. |
| Mould flow analysis |
Simulation of filling, packing and cooling used to predict weld lines, pressure and warpage. |
| Mould shrinkage |
Percentage a part contracts from cavity size as it cools; ~0.2% filled to 2.5% unfilled crystalline. |
| MUD insert |
Master Unit Die — a shared mould frame accepting interchangeable cavity inserts, cutting tooling cost. |
| Multi-cavity mould |
Tool with several identical impressions, multiplying output per cycle. |
N
| Term |
Definition |
| Nominal wall |
The designed standard wall thickness of a part, against which ribs and bosses are proportioned. |
| Nozzle |
The heated tip connecting the machine barrel to the mould's sprue or hot runner. |
O
| Term |
Definition |
| Overmoulding |
Moulding a second material over a substrate — soft TPE grips over rigid housings are typical. |
| Over-packing |
Excessive hold pressure or time, causing flash, stress and ejection difficulty. |
P
| Term |
Definition |
| Packing |
See hold pressure. |
| Parting line |
The plane where mould halves meet; leaves a witness line and must be placed deliberately. |
| Pin gate |
Small three-plate-tool gate leaving a tiny dot; enables balanced multi-cavity layouts. |
| PPAP |
Production Part Approval Process — automotive documentation package proving production readiness. |
| Pre-hardened steel |
Tool steel supplied at ~30-36 HRC (P20/718); the medium-volume production standard. |
| Projected area |
The part's shadow area in the opening direction; multiplied by cavity pressure to size clamp force. |
| Purging |
Cleaning the barrel or hot runner with purge compound or a compatible resin between materials/colours. |
R
| Term |
Definition |
| Regrind |
Recycled in-house scrap (runners, rejects) ground and blended back with virgin resin, typically 10-30%. |
| Residence time |
How long resin sits molten in the barrel/hot runner; excess causes degradation and black specks. |
| Rib |
Thin reinforcing wall, sized 40-60% of nominal wall thickness, height ≤ ~3× wall. |
| Runner |
The channel network delivering melt from nozzle to gates; cold or hot. |
S
| Term |
Definition |
| Semi-crystalline polymer |
Resin partly ordering into crystals on cooling (PP, PA, POM, PBT, PEEK); higher shrinkage, opaque. |
| Short shot |
Defect: incomplete filling — the melt front stops before the cavity is full. |
| Shot size |
Maximum melt volume a machine can inject per cycle; total shot should use ~20-80% of it. |
| Shrinkage |
See mould shrinkage. |
| Side action (slider) |
Cam-driven moving steel forming an external undercut; adds from ~€1,000-5,000+ per direction. |
| Silver streaks |
See splay. |
| Single-cavity mould |
Tool with one impression; cheapest tooling, highest unit cost. |
| Sink mark |
Defect: surface depression from local shrinkage, typically opposite ribs, bosses or thick zones. |
| Snap-fit |
Moulded-in deflecting hook fastening two parts without hardware. |
| SPI classes 101-105 |
Tool-life grading: from >1M cycles in hardened steel (101) to <500 prototype shots (105). |
| SPI finish |
Polish grading from A1 mirror through B/C semi-matt to D blasted textures. |
| Splay |
Defect: silvery surface streaks, usually moisture flashing to steam — a drying problem. |
| Sprue |
The main feed channel from machine nozzle into the mould; also the direct gate for single cavities. |
| Stripper plate |
Ejection plate pushing the part off the core evenly; enables zero-draft faces. |
| Stress whitening |
White marks at stressed or bent areas, from micro-cracking of the polymer. |
T
| Term |
Definition |
| T1 / T2 / T3 samples |
Sequential trial shots from a new or modified tool, measured and corrected toward approval. |
| Tab gate |
Cold-runner gate feeding through a sacrificial tab, reducing shear stress and jetting. |
| Thermoplastic |
Polymer that melts and re-melts (ABS, PP, PA); the standard injection-moulding material class. |
| Thermoset |
Polymer that cures irreversibly in the mould (epoxy, phenolic, BMC). |
| Three-plate mould |
Tool with a floating runner plate enabling pin gates and automatic runner separation. |
| Tolerance |
Permitted dimensional deviation; ISO 20457 classes apply to moulded parts. |
| Tool / tooling |
The mould and its mechanisms; 'tooling cost' is the one-time build price. |
| Tunnel (submarine) gate |
Angled cold-runner gate shearing off automatically at ejection; standard for automated small parts. |
| Two-plate mould |
The simplest tool construction: cavity half plus core half, opening at one parting line. |
U
| Term |
Definition |
| UL 94 |
Flammability rating for plastics: HB, V-2, V-1, V-0, 5VA from least to most stringent. |
| Undercut |
Feature preventing straight ejection (side holes, hooks); needs bump-off, lifters, sliders or redesign. |
| Unit price |
The recurring per-part price: material + machine time ÷ cavities + overhead; excludes tooling. |
V
| Term |
Definition |
| Valve gate |
Hot-runner gate with a mechanical pin sealing each cycle; cleanest witness, per-drop control. |
| VDI 3400 |
European EDM texture standard: VDI 12 (Ra ~0.4 µm, finest) to VDI 45 (Ra ~18 µm, coarsest). |
| Vent |
Shallow channel letting air escape the cavity; blocked vents cause burns and short shots. |
| Vestige |
The witness mark a gate leaves on the part. |
| Void |
Internal cavity in thick sections from shrinkage without packing compensation. |
| V/P transfer |
The switch from velocity-controlled filling to pressure-controlled packing. |
W
| Term |
Definition |
| Warpage |
Defect: distortion from differential shrinkage — bow, twist or cup. |
| Weld (knit) line |
Seam where two melt fronts meet; strength depends on temperature, angle, venting and material. |
| Witness line |
Visible mark left by the parting line, gates or ejectors; placed on non-cosmetic faces by design. |
Frequently asked questions
What is the difference between a mould and a mold?
Only spelling. 'Mould' is British/European English; 'mold' is American. Both mean the precision tool — cavity and core — that shapes molten plastic in injection moulding. Nordmould uses the European spelling throughout.
What is a cavity in injection moulding?
The cavity is the hollow half of the mould (A-side) that forms the part's outer, usually cosmetic, surface. 'Cavities' also means the number of part impressions in the tool — a 4-cavity mould makes four parts per cycle.
What does DFM mean in injection moulding?
Design for Manufacturability — the review of part geometry before tooling to remove features that would cause defects, cost or delay. Nordmould provides a free written DFM review with every quote, checking walls, draft, undercuts, gates and tolerances.
What is a T1 sample?
The first official trial shots from a completed mould. T1 parts are measured against the drawing, after which the tool is adjusted (T2, T3 if needed) and the part approved for production. First-article inspection normally accompanies T1.
What is shot size in injection moulding?
The maximum volume or weight of plastic the injection unit can deliver in one cycle. The mould's total shot — parts plus runner — should sit within roughly 20-80% of machine shot capacity for stable processing.
What is the difference between thermoplastic and thermoset?
Thermoplastics (ABS, PP, PA) melt and re-melt — they dominate injection moulding and their scrap can be reground. Thermosets (epoxy, phenolic, BMC) cure irreversibly in the mould and cannot be remelted.