RFQ brief builder
Answer what you can. Every field is optional, and gaps stay visible in the brief instead of being guessed.
Private by design. Your entries stay in this browser tab. They are not placed in the address, stored on the device, sent for analysis or uploaded. Files are not attached here; you add them in the quote form.
Your project details · Brief preview
Completion checklist
Shows which details are filled in. It does not assess your part or any supplier.
0 of 4 key details provided
0 of 14 topics filled in or marked unknown
- Project or part reference Missing
- Drawing revisionKey detail Missing
- Files to supply Missing
- Material (grade or requirements)Key detail Missing
- Finish and colour Missing
- Critical dimensions Missing
- Acceptance and measurementKey detail Missing
- Sampling, inspection, documents Missing
- First batch quantityKey detail Missing
- Repeat demand Missing
- Target date Missing
- Delivery destination Missing
- Tool ownership and maintenance Missing
- Outstanding questions Missing
A filled checklist does not mean the design is suitable, approved or ready to quote. The supplier decides what else it needs.
Brief preview
Quote message length: 930 / 4000 characters
Total input: 0 / 10000 characters
Use the brief
Fill in at least one detail first.
How this brief is built
- Each entry is cleaned of extra spaces and blank lines and placed under a fixed heading. Nothing is added, rounded or guessed.
- Missing details print as "Not provided". Details you mark as unknown print as "Unknown, to be agreed". Both stay visible to the supplier.
- Drawing revision, material, first batch quantity and acceptance are flagged as key details because quotes often depend on them. This is a prompt, not a rule.
- The checklist only counts filled-in fields. It makes no pass, fail or technical approval statement about your part, material or tolerances.
- Quantity must be a whole number and a target date must be a real date that is not in the past. Quantity and date are passed to the quote form only when valid.
The tool does not read drawings or CAD files, does not recommend materials or processes, and contains no prices or lead times.
Hypothetical example brief
A fictional example that only shows the format. It is not a recommendation, a price or a typical order.
RFQ brief: injection moulding Draft prepared by the buyer. It contains no supplier price, approval or commitment. [Part and drawings] Project or part reference: EXAMPLE-001 (fictional bracket) Drawing revision: B Files you will supply: 2D drawing as PDF and 3D model as STEP (fictional example) [Material and finish] Functional material requirements: Indoor use, light loads, no food contact (fictional example) Finish and colour: Matt black (fictional example) [Quality and acceptance] Critical dimensions: Two hole positions relative to datum A (fictional example) Acceptance and measurement: Measure the two hole positions on 5 samples of the first batch; visual check against agreed samples (fictional example) Sampling, inspection and documents: First-sample inspection report requested [Quantity and delivery] First accepted batch quantity: 5000 Repeat demand: Unknown, to be agreed Target date: Unknown, to be agreed Delivery destination: Example country (fictional) [Tooling] Tool ownership, storage and maintenance: Who owns and stores the tool? Who maintains it? [Questions] Outstanding questions: Please state your assumptions and exclusions. Files are not attached to this text; they are shared separately.